Key changes in detail

How the revised methodology works

The key changes in full, and the sample pathways as the Technical Council finalizes them. Everything here is a working concept that can still change, and the consultation is the moment to shape it.

The prototype

Key changes

Each change is set out in full in the paper. The short version, and why it matters to a building owner.

1. Energy and carbon are decoupled

Then

The Energy Pathways were derived from the Carbon Pathways through a building-stock-weighted emission factor, with a leveling year where the pathway flattened.

Now

The Energy Pathways come directly from IEA Net Zero building energy demand, as a continuous curve from 2025 to 2050. Grid emission intensity plays no part.

Why it matters

A signal tied to grid intensity does not measure how efficiently a building uses energy. Under the old approach an inefficient building on a fast-decarbonizing grid could look aligned, while an efficient building on a carbon-intensive grid received a smaller energy budget. The leveling year is gone.

2. The IEA scenario is updated

Then

The 2021 IEA Net Zero scenario.

Now

The Net Zero Emissions scenario in World Energy Outlook 2025.

Why it matters

The pathways start from the IEA's latest scenario assumptions for buildings. Those projections include data centers, which CRREM does not yet cover, so their share is taken out of the budget. The IEA's demand cases put data centers at 7% to 22% of service-sector building energy in 2050, and the Technical Council selected the High Efficiency case, at about 11%.

3. The budget is allocated by floor area

Then

The global budget was weighted primarily by population.

Now

It is weighted by projected real estate floor area, per property type.

Why it matters

CRREM assesses buildings, and energy use in real estate tracks the building stock. Population-based weighting distorts markets where the service economy and the building stock are not proportional to population. As emerging economies add stock, their share of the budget grows with it.

4. Heating and cooling follow the climate

Then

Static heating and cooling values.

Now

Heating and cooling shares adjusted to each jurisdiction's climate, using heating and cooling degree day projections through 2050. The paper uses a cooling base of 10°C and a heating base of 16°C, and the Technical Council is still weighing the thresholds and whether to use dry-bulb or wet-bulb temperatures.

Why it matters

A warming climate cuts heating demand and raises cooling demand, even as cooling equipment gets more efficient. Static values miss that shift, and they miss the temperature differences between jurisdictions that share a climate zone.

5. Energy end uses are specific to property type and climate

Then

One building service-sector breakdown applied everywhere, with a uniform base load of about 75% for every property type.

Now

Breakdowns specific to property type and climate zone, from CBECS 2018. For an office in a mixed or mild climate zone, base load is about 59% in 2025, rising to about 71% by 2050.

Why it matters

A uniform base load obscures how different property types use energy, and which efficiency levers are actually available to each.

6. Targets are tested against real buildings

Then

No systematic check on whether a pathway endpoint was achievable. This was a central criticism from the Market Sounding.

Now

A Technical Feasibility Test applied after the pathway is calculated, for each jurisdiction and property type, comparing the 2050 target against observed building-stock performance and realistic retrofit potential.

Why it matters

Downscaling a global budget to a specific pathway means making assumptions. Testing the outcome shows where those assumptions need challenging. The test is a sense-check on the outputs. Where an end point looks technically infeasible, the inputs behind it are re-examined: starting EUIs, property type definitions, end-use breakdowns, floor area projections and degree-day adjustments. The Technical Council is also exploring whether energy budget could be reallocated between pathways in a budget-preserving way, as a final, documented calibration step. That idea is exploratory and has not yet gone to a Technical Council vote.

Sample pathways

How the methodology translates into numbers

The paper carries illustrative sample pathways for offices in nine markets that span cool temperate to tropical climates: the Netherlands, the United Kingdom, Germany, New York in the United States, two Australian climate zones, Hong Kong, Singapore and Brazil. Retail shopping malls are taking more time, because starting energy use varies widely between markets even within one climate zone, and the paper explains how the Technical Council is working through that.

They are an illustration rather than a result. Where the underlying data is thin, the values are correspondingly uncertain, and they will change as richer data arrives. The consultation is on the concept methodology, and the sample pathways are not up for approval.

If a sample pathway for your market looks implausible or too generous, you probably have good reasons, and often data. We want both. Feedback helps most when it arrives with the underlying consumption figures.

Seen enough to have a view?

The consultation runs until 4 December 2026, and feedback lands directly with the Technical Council.

Respond to the consultation
Our StoryWho we are, our evolution from EU research project to global foundationTeamThe people behind the CRREM FoundationGovernanceFoundation Board, Technical Council, Regional Advisory CommitteesFundingHow CRREM is funded and our commitment to independence
Explore PathwaysAccess CRREM Pathway data and download resourcesHow to Use CRREMPractical guidance for portfolio assessment, target-setting, and retrofit planningMethodologyHow pathways are developed, updated, and maintainedOpen-ContributionHow the market contributes data to strengthen the CRREM PathwaysEnergy Pathways ConsultationA first look at the revised methodology, open for comment until 4 DecemberChange & Update ProtocolVersion history, update procedures, and transparency commitmentsDevelopment OutlookScheduled releases, exploratory work in progress, and how to contribute
LibraryBrowse all CRREM resources — publications, guides, case studies, and best practicesFAQFrequently asked questions about CRREM and the PathwaysPublicationsResearch papers, reports, and collaboration documentsReference GuidesTechnical reference documents for in-depth understanding
OverviewCRREM's partner ecosystem and how organizations work with usAccredited Service ProvidersAdvisory and consulting firms accredited to apply CRREM's assessment methodologyLicense PartnersSoftware platforms integrating CRREM Pathway dataBecome a PartnerHow to apply for a partnership with the CRREM Foundation
NewsPress releases, announcements, and updates from the CRREM FoundationPublic ConsultationsActive market consultations with participation detailsEventsUpcoming and past events, townhall meetings, and conferencesNewsletterSubscribe to the CRREM Foundation newsletter and browse the archive
?
Ask CRREM AI assistant
Before you download

Access to CRREM Data

CRREM Data is free to use for research, investment analysis, reporting, and internal decision-making, with attribution. Commercial redistribution, embedding in paid software, and index or fund construction require a separate License Partner agreement.

Join us on the pathway

Whether you're an investor, asset manager, or real estate sustainability professional — let's stay close.

What best describes you? *